How It Works

The project leads. The furniture follows it.

Pieces can be organised by room, by area, or by procurement package. The sequence below is the same in each case. What changes is how the schedule is grouped.

Pencil lines on a timber panel, with chisels beside them
What arrives. A drawing, or the lines already marked on the piece. Dimensions are still a proposal.Reference
A solid timber seat in a quiet plaster room
What follows. Making starts after the specification is approved.Reference
  1. 01

    Submit the schedule and references

    A timber panel marked in pencil

    You provide

    Drawings, a furniture schedule or BOQ, references, and the material habits the studio already works with.

    MODALITY returns

    A first reading of the scope, arranged by room, area, or procurement package, and the questions that change the specification.

  2. 02

    Compare materials and budget

    Solid timber stacked in side light

    You provide

    Preferences, constraints, and a note of which decisions are still open.

    MODALITY returns

    Material options set beside an indicative budget, so the design can move before a quotation is written.

  3. 03

    Confirm the specification and match suppliers

    Marble and a brass edge

    You provide

    The confirmed specification, quantities, and the approval route for the project.

    MODALITY returns

    A matched way of making each piece. Matching weighs craft, material, quantity, quality requirements, and the project schedule. Whether that match can proceed is part of the project review.

  4. 04

    Approve samples and drawings

    Leather upholstery in side light

    You provide

    Comments and approvals, through the studio’s own process.

    MODALITY returns

    Drawings and sample records revised to what was approved.

  5. 05

    Coordinate production and delivery

    An oak bench against plaster

    You provide

    Site dates, access, and any change that has already been approved.

    MODALITY returns

    Coordination of making and delivery against the confirmed supply scope.

Enquiry

Bring the schedule and the references.

Supplier matching waits until the specification and quantities are far enough along to review craft, material, quantity, quality, and the project schedule together.